600 INCIDENTALS

gutters with riprap, concrete, crushed aggregate or rock or dumped rock .... mixed in the proportion of one part cement and three parts sand by volume. ... membrane cure shall be applied at the rate of not less than 1 gallon (3.8 L) per 200 square ... in cross section, not less than 1/3 cubic foot (0.01 m2) in volume nor less.

More details » Get Price

600 INCIDENTALS - City of Columbus, Ohio

601.10 Detention Basin, Infiltration Basin, or Water Quantity Swale Aggregate. 601.11 Paved ... than 1 gallon per 200 square feet (1 L/5 m2) of surface. ... concrete for each square yard (square meter) of riprap in place as measured along the slope. ... Make the grout by mixing one part portland cement, three parts sand, and.

More details » Get Price

Chapter 7 - Florida Department of Transportation

Jun 12, 2007 ... Alternatively, it may be paid for per square yard or square meter. (C) Barrier Wall: ... Only the volume of sand-cement riprap, concrete blocks,.

More details » Get Price

ITEM NO. 591S RIPRAP FOR SLOPE PROTECTION ... - City of Austin

Sep 1, 2011 ... rock riprap shall be 150 pounds per cubic foot or a specific gravity .... Grout and mortar shall consist of 1 part Portland Cement and 3 parts sand, thoroughly .... in place or (b) the volume of concrete placed in cubic yards (cubic.

More details » Get Price

EQUIPMENT CAPABILITES - Scribd

Nov 28, 2009 ... 4.50 C. Grouted Riprap 4.20 Plain Riprap D. Lean Concrete 5.00 1000 ... Quantity of Cement and Sand for CHB Mortar per square meter wall...

More details » Get Price

QUANTITIES OF MATERIALS FOR COMPLETED ITEMS ... - MPWRD

should be worked out as per mode of measurements specified in schedule of rates. S.No. Item. Unit ... Cement. Sand. 0.50 cum. 1.00 cum. 6. Cement mortar 1:3 cum. Cement. Sand. 0.33 cum .... flooring in cement concrete with neat cement floating coat. sq. m. C.C.. Cement (for .... 76 Providing dumped rip rap cum. Rubble.

More details » Get Price

Chapter 6 - Tools for Hydraulic and Road Design

sized Riprap for stream bank and scour protection, use Filter Zones ... Q = discharge, in cubic meters per second ... meters per second (m/s) ... Volume Roads Manual, the FHWA .... then the use of cement grouted ... of coarse sand, gravel, or a.

More details » Get Price

User Guide - Adelaide Brighton Cement

Laying Pavers. • Rip Rap Walls ... materials by volume in a suitable container (i.e. a bucket). Do not ... The coarse aggregate, sand and cement should ... Per Bag. Yield. Per Bag. Bags/m2. @ 50mm. Thick. Bags/m2. @ 100m. Thick. Bags/m2.

More details » Get Price

How to calculate cement and sand quantities in cement mortar As 1 ...

thu quantity of cement in bags = 0.228/0.0347= 6.57 bags quantity of ... metres of sand. density of cement as 1440kg/m3, mass of ... Area to be Plastered = 10 m2

More details » Get Price

sec620to635_p6-110to129 - Department of Transportation - New ...

Grouted rip-rap shall consist of stone similar to dry rip-rap but with all ... The grout shall consist of one part cement conforming to the requirements for Portland Cement ... requirements of §701-Ol, and two parts Mortar Sand, conforming to the requirements of .... The unit price bid per square meter for this item shall include.

More details » Get Price

What is the average price of a cubic yard of concrete? | Ask.com

The proportion of sand, gravel and cement varies, and areas that freeze in the winter will need a ... Rip rap weighs between 1.5 and 2.0 tons per cubic yard.

More details » Get Price

Unit Price Averages Reports - Alberta Ministry of Transportation

Dec 22, 2014 ... As well, the unit price averages are weighted by bid quantity. These unit price ... Quantity Unit. Average of ... 1 742 372.0 m2. $1.61. B181 ... Salvage and Reinstall Existing Riprap. 1 ..... Portland Cement Concrete Pavement. 2.

More details » Get Price

Dolese: FAQ

Cement comprises from 10 to 15 percent of the concrete mix, by volume. Through a process ... Translated into dimensions, this is about 1/16 of an inch in 10 feet (0.4 cm in 3 meters). The reason .... Riprap, Large stone used for erosion control ... 330 cubic feet ÷ 27 cubic feet per cubic yard = 12.2 cubic yards. 12.2 cubic...

More details » Get Price

Quantity Computations - Illinois Department of Transportation

Guidelines for Preparing Quantity Computations . ..... FOOT. 1. CONCRETE BLOCK RIPRAP. SQUARE YARD. 1. CONCRETE BOX CULVERTS ... CONTINUOUSLY REINFORCED PORTLAND CEMENT CONCRETE .... SAND BACKFILL.

More details » Get Price

Standard Specifications for Construction of Roads and Bridges on ...

ac km square kilometers. 0.386 square miles mi. 2. 2. VOLUME. mL milliliters. 0.034 fluid ounces fl oz. L liters. 0.264 gallons gal m cubic meters. 35.71 cubic feet ft. 3. 3 m cubic meters. 1.307 cubic yards yd. 3. 3. MASS g ... per square inch ..... 502 Portland Cement Concrete Pavement Restoration . . . . 340 ..... Riprap Rock .

More details » Get Price

Standard Specifications

property line shall be equal to a rise of 1/4 inch per foot from the back of the ... center drains and rip rap in accordance with lines, grades and the sections shown ..... consisting of two (2) sacks Portland cement to one (l) cubic yard of caliche ..... Fine Aggregates - Natural sand and screenings crushed from the same or similar.

More details » Get Price

2011 Standard Specifications - Government of New Brunswick

301 Portland Cement Concrete. 302 Concrete in ... 608 Random Riprap. 609 Rock Weir .... mm2/s square metre per second m2/s. Volume solid cubic millimetre mm3 .... sand particle passing a 4.75 mm sieve and retained on a 75 µm sieve. silt.

More details » Get Price

NJDOT 2007 Specifications - Division 900 Materials

At concrete and HMA mixing plants, stockpile a sufficient quantity of aggregate .... Weight per cubic foot (loose measure), pounds, AASHTO T 19, 60 minimum ... For HMA surface course, use fine aggregate that is manufactured stone sand or natural sand. .... Use riprap stones that consist of a uniformly graded mixture of rock...

More details » Get Price

Technical Specifications for Civil and Public Health works - BARC

Apr 1, 2003 ... Minimum cement content shall be 400 kg per cubic metre. ... of excess cement over the minimum quantity specified shall be borne by the contractor. .... regular heaps, bunds, and riprap with regular slope as directed by the ... These shall include all kinds of soils containing kankar, sand, silt, murrum and/ or...